Clifton HS Front Elevation
Smithville High School
 
Projects
 

Clear Creek Road Medical Office Building, Phase II
Clear Creek Partners, Ltd.
Killeen, Texas
Contact Person – Wallace Vernon (254) 289-4540
Architect – Freese and Nichols, Inc. John New (210) 224-4400
Contract Amount - $1.3 Million
Delivery Method – CM-at-Risk
Approximately 10,000 SF new office building with a pharmacy, laboratory space, doctor’s offices, and associated site work.
------------------------------------------------------------------------------------------------------------------------------------
Clear Creek Road Medical Office Building
Clear Creek Partners, Ltd.
Killeen, Texas
Contact Person – Wallace Vernon (254) 289-4540
Architect – Freese and Nichols, Inc. John New (210) 224-4400
Contract Amount - $2.4 Million
Delivery Method – CM-at-Risk
Approximately 20,000 SF new office building with indoor physical therapy pool, doctor’s offices, and associated site work.

------------------------------------------------------------------------------------------------------------------------------------
Hughes Springs Gymnasium
Hughes Springs ISD
Hughes Springs, TX
Contact Person – Rick Ogden
Phone (903) 639-3803 Fax (903) 639-2624
Architect – Mark Glenn (903) 791-1719
Delivery Method – CM Agency                       
Contract Amount – $2.26 Million
Complete new competition gymnasium with locker rooms, concession stand, public restrooms and associated site work at the existing high school.
------------------------------------------------------------------------------------------------------------------------------------Hughes Springs Earth Science Center
Hughes Springs ISD
Hughes Springs, TX
Contact Person – Rick Ogden
Phone (903) 639-3803 Fax (903) 639-2624
Architect – Mark Glenn (903) 791-1719
Delivery Method – CM Agency                       
Contract Amount – $525,000
Complete new earth science center with two labs, prep room, public restrooms and canopy.
------------------------------------------------------------------------------------------------------------------------------------Mansfield Fire Station #4
City of Mansfield
Mansfield, TX
Contact Person – Chief Eric Peterson
Phone (817) 276-4790 Fax (817) 276-4787
Architect – Freese & Nichols, John New
Phone (210) 224-4400 Cell (210) 865-5461                
Contract Amount – $1.7 Million
Contract Form – CM-at-Risk
Complete new four bay fire station on a new site.
------------------------------------------------------------------------------------------------------------------------------------New High School and Other Renovations
Smithville ISD
Smithville, TX
Contact Person – Mr. Gary Sage, Superintendent
Phone (512) 237-2487 Fax (512) 237-2775
Architect – Pfluger & Associates, George Austria
Phone (512) 476-4040 Fax (512) 476-4040                 
Contract Amount – $13,071,780
Contract Form – CM Agency
Complete new high school with gymnasium, cafetorium, baseball fields, softball fields and all site amenities.     

Misc. renovations through out district to include additional asphalt parking, remodel restrooms for ADA compliance, replace patio canopy, correct drainage of courtyard area, add new field house, expand football stadium seating and parking, renovate restrooms and concession areas at football field, paint annex building. New high school on new site estimated at approximately 118,500 square foot.
------------------------------------------------------------------------------------------------------------------------------------Clements Boys and Girls Club/ Killeen ISD Natatorium
Clements Boys and Girls Club, Inc.
Killeen, Texas
Contact Person – Wallace Vernon (254) 526-0571
Architect – Freese and Nichols, Inc. John New (817) 735-7300
Contract Amount - $6.5 Million
Contract Form – CM Agency
Approximately 52,000 SF new recreation center/natatorium designed for joint use between the
club and KISD athletic department.  Building will house two gymnasiums, two indoor swimming
pools, a large game room, meeting hall, full kitchen, restrooms, offices and required circulation.
------------------------------------------------------------------------------------------------------------------------------------Renovations to Memorial Primary, Memorial Elementary, Memorial Intermediate
New Braunfels Independent School District
New Braunfels, TX
Contact Person – Daryl Stoker (830) 627-6731
Architect – Mormon Mok & Associates – Robert Lozano (210) 223-9492
Delivery Method – CM-at-Risk
Contract Amount - $1.4 Million
Contract Form – CM-at-Risk
Renovation to existing schools to include new finishes in classrooms, HVAC renovations, plumbing renovations and various electrical renovations.  BCSI is the completion contractor on this project taking over for a defaulted general contractor.

------------------------------------------------------------------------------------------------------------------------------------
Upper Trinity Regional Water District
Main Office Additions and Renovations
Lewisville, TX
Contact Person – John Zink, Construction Project Manager (972) 219-1228
Architect – BOKA Powell, LLC  (972) 701-9000
Delivery Method – CM-at-Risk
Contract Amount - $389,114
Renovation and addition to existing main office facility to include a new boardroom.  BCSI has been awarded as the completion contractor on this project taking over for a defaulted general contractor.

------------------------------------------------------------------------------------------------------------------------------------Blessed Sacrament Academy Charter High School
Por-Vida Inc.
San Antonio, TX
Contact person – Joseph Rendon (210) 532-8816
Architect – Lindy Ballew Architects (214) 252-0883
Delivery Method – Design/Build
Contract Amount - $1.4 Million
Addition and renovation to existing high school.
------------------------------------------------------------------------------------------------------------------------------------Burnet County Annex Building in Marble Falls, TX
Burnet County Commissioners Court
Burnet, TX
Contact Person – Bill Neve, Burnet County Commissioner (512) 756-5420
Architect – Huckabee and Associates, Mike King (817) 377-2969                                          
Delivery Method – Sealed Competitive Proposal
Contract Amount –  $1,000,000
Completed – January 2002
Approximately 8,600 sq. ft. Burnet County court annex building located in Marble Falls, TX
------------------------------------------------------------------------------------------------------------------------------------
Burnet County Court Annex Building in Burnet, TX
Burnet County Commissioners Court
Burnet, TX
Contact Person – Bill Neve, Burnet County Commissioner (512) 756-5420
Architect – Huckabee and Associates, Mike King (817) 377-2969                   Delivery Method – Sealed Competitive Proposal
Contract Amount – $2,716,000
Completed – June 2002
Approximately 26,000 square foot Burnet County court annex building located in Burnet, TX. 

------------------------------------------------------------------------------------------------------------------------------------
Lampasas County Courthouse Annex
Lampasas County Commissioners Court
Lampasas, TX
Contact Person – Judge Ed Lilley, Lampasas County (512) 556-8271          Architect – Komatsu Architects, Les Edmonds, AIA, (817) 332-1914
Delivery Method – Construction Manager Agency
Contract Amount – Estimated at $1,810,000
Completed – April 2002
Approximately 12,000 SF new courthouse annex with historical architectural detailing to match other buildings on the Lampasas square, metal building, brick veneer.
------------------------------------------------------------------------------------------------------------------------------------ Taylor Middle School
Taylor Independent School District
Taylor, TX
Contact Person – Mr. David Krueger, Assistant Superintendent (512) 352-6361
Architect – Claycomb & Associates, Mr. Larry Claycomb (972) 233-6100
Delivery Method – Construction Manager-at-Risk
Contract Amount - $9,794,869
Completed – August 2001
Approximately 110,000 SF middle school, metal building, metal roof, masonry veneer.
------------------------------------------------------------------------------------------------------------------------------------Auditorium and Fine Arts Center
Copperas Cove Independent School District
Copperas Cove, TX
Contact person – Mr. Dick Parker, Ret. Superintendent, Home Phone (512) 556-2624
Architect - Claycomb & Associates, Mr. Larry Claycomb (972) 233-6100
Delivery Method - Construction Management Agency
Contract Amount - $7,422,000
Completed – March 2001
New Auditorium with seating for 1,000, band hall, choir hall, four science labs, and two art rooms. Auditorium will be complete with fly loft, stage rigging and drapes, and full sound system.  Structural steel and masonry with brick veneer. Approx. 65,000 SF.    

------------------------------------------------------------------------------------------------------------------------------------
Florence High School
Florence Independent School District
Florence, TX
Contact person – Dr. Pam Harrison, Former Superintendent (254) 519-5418
Architect - Pfluger & Associates, Mr. George Austria (512) 476-4040
Delivery Method - Construction Management Agency
Contract Amount - $4,700,000
Completed – August 2001
58,000 SF high school with cafetorium and complete vocational area to be bid as an alternate.  Structure is a metal building with standing seam metal roof, masonry veneer and corridors.
------------------------------------------------------------------------------------------------------------------------------------Sports Facility Complex/Natatorium
Central Texas College
Killeen, TX
Contact Person - Mr. Bob Farrell, Deputy Chancellor for Resource Management (254) 526-1331
Architect - Freese/Nichols Architects - Mr. John New, Architect (817) 735-7300
Delivery Method - Construction Management-at-Risk
Contract Amount - $8,288,802
Approximately 48,844 SF sports facility to include: double gym, weight room, aerobics area, locker/shower facilities, public areas, classrooms and offices.  The project also includes an indoor pool, double gym, weight room, aerobics room, classrooms, restrooms, offices, football/soccer field and track, baseball field, 6 tennis courts, 2 volleyball courts and parking/lighting.
------------------------------------------------------------------------------------------------------------------------------------C.R. Clements Intermediate School
Copperas Cove Independent School District
Copperas Cove, TX
Contact person - Mr. Dick Parker, Retired Superintendent (512) 556-2624
Architect - Claycomb & Associates, Mr. Larry Claycomb (972) 233-6100
Delivery Method - Construction Management Agency
Contract Amount - $4,400,000
Completed - November 2000
New intermediate school for 700 students.  School will be added to the Hollie Parsons elementary complex (completed in 1994, listed below).  Building will be structural steel, structural masonry and split face block veneer.  Building will be complete with science, math and computer labs along with a gym, choir and band hall. Approx 54,000 SF.
------------------------------------------------------------------------------------------------------------------------------------Cooper Jr/Sr High School
Cooper Independent School District
Cooper, TX
Contact person - Mr. Fred Wilkerson, Retired Superintendent (903) 395-2134
Architect - Claycomb & Associates, Mr. Larry Claycomb (972) 233-6100
Delivery Method - Construction Management Agency
Original Contract Amount - $7,100,000
Completed – February 1998
104,000 SF combination junior high/high school with all applicable facilities including double competition gymnasium, media center, cafetorium with stage, and complete vocational area. Structural masonry, structural steel and brick veneer construction.
------------------------------------------------------------------------------------------------------------------------------------Cooper Jr/Sr High School Fieldhouse
Cooper Independent School District
Cooper, TX
Contact person - Mr. Fred Wilkerson, Retired Superintendent, Home Phone (903) 395-2134
Architect - Claycomb & Associates - Mr. Larry Claycomb (972) 233-6100
Delivery Method - Construction Management Agency
Contract Amount - $860,000
Completed – November 1998
8,900 SF field house with complete dressing/shower areas.  Structural masonry with brick veneer.
------------------------------------------------------------------------------------------------------------------------------------Brady Intermediate School
Brady Independent School District
Brady, TX
Contact person - Mr. Max Gordon, Superintendent (915) 597-2301
Architect - Pfluger & Associates - Mr. George Austria (512) 476-4040
Delivery Method - Construction Management Agency
Contract Amount - $5,014,000
Completed – June 1999
New intermediate school with complete athletic facilities.  Pre-engineered metal building, brick veneer and metal roof.  Approx. 67,000 square feet.
------------------------------------------------------------------------------------------------------------------------------------China Elementary Addition
Brady Independent School District
Brady, TX
Contact person - Mr. Max Gordon, Superintendent (915) 597-2301
Architect - Pfluger & Associates - Mr. George Austria  (512) 476-4040
Delivery Method - Construction Management Agency
Contract Amount - $3,300,000
Completed – October 1998
Addition to existing elementary school.  Additions include classrooms, restrooms, and cafeteria expansion and renovation.  Building is pre-engineered metal with brick veneer and metal roof.  Approx. 38,000 square feet.
------------------------------------------------------------------------------------------------------------------------------------Clifton High School
Clifton Independent School District
Clifton, TX
Contact person - Ms. Marleen Zipperlen, Previous Superintendent (254) 675-3701
Architect - Claycomb & Associates, Mr. Larry Claycomb (972) 233-6100
Delivery Method - Construction Management Agency
Contract Amount - $5,254,580
Completed – March 1999
Complete high school with a double competition gymnasium, large media center, cafetorium with stage and complete kitchen, administration area, and physical education and dressing facilities.  Building is approximately 81,000 square feet of pre-engineered metal with some structural masonry and brick veneer with metal roof.
------------------------------------------------------------------------------------------------------------------------------------Athletic Annex
Copperas Cove Independent School District
Copperas Cove, TX
Contact person - Mr. Dick Parker, Retired Superintendent, Home Phone (512) 556-2624
Architect - Claycomb & Associates, Mr. Larry Claycomb (972) 233-6100
Delivery Method - Construction Management Agency
Contract Amount - $1,500,000
Completed – March 1999
20,000 SF Pre-engineered metal building.  Athletic annex to include offices, weight room, and locker/shower facilities.  Also includes softball practice field, 4 tennis courts, parking and a bus drive.
------------------------------------------------------------------------------------------------------------------------------------Junior/Senior High School
City View Independent School District
Wichita Falls, TX
Contact Person - Mr. Michael Smith, Superintendent (940) 855-4042
Architect - Staley-Baker-Monson Architects, Monty Monson (940) 692-1004
Delivery Method - Construction Management-at-Risk
Contract Amount - $9,895,821
Completed – December 2000
Main building 97,863 SF, Vocational building 4,142 SF, Field House/Concession 9,568 SF with athletic facilities.
-----------------------------------------------------------------------------------------------------------------------------------Rogers Elementary Additions
Rogers Independent School District
Rogers, TX
Contact person – Ms. Katy Ryan, Superintendent (254) 642-3802
Architect - Claycomb & Associates - Mr. Larry Claycomb (972) 233-6100
Delivery Method - Construction Management Agency
Contract Amount - $2,252,000
Completed – July 1999
New two story classroom addition.  New construction will consist of 14 new classrooms and a lab synthesis area.  Structural steel construction with masonry veneer.  Approx 25,000 SF.
------------------------------------------------------------------------------------------------------------------------------------Hutto High School
Hutto Independent School District
Hutto, TX
Contact person – Mr. Bert Johnson, Business Manager (512) 846-3134
Architect - Pfluger & Associates, Mr. George Austria  (512) 476-4040
Delivery Method - Construction Management Agency
Contract Amount - $11,621,000
Completed – September 1999
New high school for 800 students (expandable) including complete athletic facilities - football stadium, softball, baseball, practice fields, concessions, and bleachers.  Building will be approximately 136,000 SF.  Structural steel with brick veneer, structural masonry, and some metal building.
-----------------------------------------------------------------------------------------------------------------------------------Salado Intermediate School
Salado Independent School District
Salado, TX
Contact person – Dr. Robin Battershell, Superintendent (512) 947-5479
Architect - Claycomb & Associates - Mr. Larry Claycomb (972) 233-6100
Delivery Method - Construction Management Agency
Contract Amount - $5,100,000
Completed – August 1999
New intermediate school to house grades 5-8.  Pre-engineered metal building construction with masonry veneer and metal roof.  Building will have complete competition gymnasium, media center and all necessary administrative areas.  Approx. 60,000 SF.

-----------------------------------------------------------------------------------------------------------------------------------Taylor High School Addition
Taylor Independent School District
Taylor, TX
Contact person – Bill Mikulcek,  (512) 352-6361
Architect - Claycomb & Associates, Mr. Larry Claycomb (972) 233-6100
Delivery Method - Construction Management Agency
Contract Amount - $1,500,000
Completed – January 1998
21,000 SF science addition at the high school.  Structural steel with brick veneer.  Complete science labs and prep rooms with an integral greenhouse.

-----------------------------------------------------------------------------------------------------------------------------------
Mae Stevens Elementary Addition
Copperas Cove Independent School District
Copperas Cove, TX
Contact person - Mr. Dick Parker, Retired Superintendent, Home Phone 512) 556-2624
Architect - Claycomb & Associates, Mr. Larry Claycomb (972) 233-6100
Delivery Method - Construction Management Agency
Contract Amount - $892,750
Completed – January 1999
Elementary playgym with stage, new computer labs, new music room, restrooms and storage.  Structural steel, masonry and brick veneer.  Approx 9,700 SF.
-----------------------------------------------------------------------------------------------------------------------------------Martin Walker Elementary Addition
Copperas Cove Independent School District
Copperas Cove, TX
Contact person - Mr. Dick Parker, Retired Superintendent, Home Phone (512) 556-2624
Architect - Claycomb & Associates, Mr. Larry Claycomb (972) 233-6100
Delivery Method - Construction Management Agency
Contract Amount - $803,000
Completed – December 1999
Elementary playgym with stage, new library, new music room, restrooms and storage.  Structural steel, masonry and brick veneer.  Approx 9,700 SF.

-----------------------------------------------------------------------------------------------------------------------------------Hutto Elementary Addition
Hutto Independent School District
Hutto, TX
Contact person – Mr. Bert Johnson, Business Manager (512) 846-3134
Architect - Pfluger & Associates, Mr. George Austria (512) 476-4040
Delivery Method - Construction Management Agency
Contract Amount - $1,700,000
Completed – March 1998
Elementary Addition including 10 classrooms and a competition gym with bleachers.  Approx. 26,000 square feet. Pre-engineered metal building construction with brick veneer and metal roof.
-----------------------------------------------------------------------------------------------------------------------------------Florence High School Addition
Florence Independent School District
Florence, TX
Contact person – Dr. Pam Harris, Former Superintendent (254) 519-5418
Architect - Pfluger & Associates Mr. George Austria  (512) 476-4040
Delivery Method - Construction Management Agency
Contract Amount - $2,050,000
Completed – December 1997
25,000 SF addition to the high school complete with a competition gymnasium, classrooms, kitchen, concession area and dressing facilities.  Combination structural steel and metal building construction with brick veneer.
-----------------------------------------------------------------------------------------------------------------------------------Rogers Cafetorium/Media Center
Rogers Independent School District
Rogers, TX
Contact person – Ms. Katy Ryan, Superintendent (254) 642-3802
Architect - Claycomb & Associates, Mr. Larry Claycomb (972) 233-6100
Delivery Method - Construction Management Agency
Contract Amount - $1,750,000
Completed – November 1997
17,500 SF cafetorium/media center complete with restrooms and kitchen.  Structural masonry with split face masonry veneer.

-----------------------------------------------------------------------------------------------------------------------------------
Addition to Fairview Elementary School
Copperas Cove Independent School District
Copperas Cove, TX
Contact person - Mr. Dick Parker, Retired Superintendent, Home Phone (512) 556-2624
Architect - Claycomb & Associates, Mr. Larry Claycomb (972) 233-6100
Deliver Method - Construction Management Agency
Contract Amount - $1,200,000
Completed – August 1997
20,200 SF addition including eight classrooms, library, restrooms and office addition.  Structural steel with brick veneer to match existing building.

-----------------------------------------------------------------------------------------------------------------------------------
Addition to Jewell Elementary
Copperas Cove Independent School District
Copperas Cove, TX
Contact person - Mr. Dick Parker, Retired Superintendent, Home Phone (512) 556-2624
Architect - Claycomb & Associates, Mr. Larry Claycomb (972) 233-6100
Delivery Method - Construction Management Agency
Contract Amount - $1,000,000
Completed – August 1997
17,800 sq. ft. addition, including classrooms, restrooms and cafeteria.  Structural steel and brick veneer to match existing building.

 